注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)工業(yè)技術(shù)建筑科學(xué)工具書/標(biāo)準(zhǔn)DL/T 5308—2013 水電水利工程施工安全監(jiān)測技術(shù)規(guī)范(英文版)

DL/T 5308—2013 水電水利工程施工安全監(jiān)測技術(shù)規(guī)范(英文版)

DL/T 5308—2013 水電水利工程施工安全監(jiān)測技術(shù)規(guī)范(英文版)

定 價:¥17.00

作 者: 中國電力出版社
出版社: 中國電力出版社
叢編項:
標(biāo) 簽: 暫缺

ISBN: 9787519842901 出版時間: 2020-04-01 包裝: 平裝
開本: 32開 頁數(shù): 29 字?jǐn)?shù):  

內(nèi)容簡介

  This specification is prepared in accordance with the requirements of Notice on Development and Revision of the First Batch of Energy Industry Standards in 2010 (GNKJ (2010) No.320).During drafting this specification, the drafting team has conducted extensive researches and investigations, summarized main technical measures for construction safety monitoring of hydropower and water resources projects, and incorporated the latest research results.This specification covers the content of safety monitoring for works including slope excavation, cofferdam, underground works,concrete dam and powerhouse and earth-rockfill dam, and processing and analysis of monitoring data.This specification was proposed by China Electricity Council.

作者簡介

  本標(biāo)準(zhǔn)由中國電力企業(yè)聯(lián)合會提出。本標(biāo)準(zhǔn)由電力行業(yè)水電施工標(biāo)準(zhǔn)化技術(shù)委員會歸口。本標(biāo)準(zhǔn)主要起草單位:中國水利水電第三工程局有限公司。本標(biāo)準(zhǔn)參加起草單位:中國葛洲壩集團(tuán)股份有限公司、中國水電建設(shè)集團(tuán)十五工程局有限公司。本標(biāo)準(zhǔn)主要起草人:王鵬禹、李磊、姬脈興、謝凱軍、陳光榮、邢昊、白美剛、李永齊、劉渭東、李曉光、南大偉、董棟、岳鵬、馬建勛、周虹、龍志強(qiáng)、郭屹東、王永、彭成軍、姚紅兵。本標(biāo)準(zhǔn)主要審查人:周厚貴、毛亞杰、汪毅、鄭平、楚躍先、康明華、陳宏、梅錦煜、吳國如、鄭桂斌、劉玉山、蔡啟光、尚宏、羅維成、牛宏力、吳高見、楊成文、吳旭、黃巍、何小雄、譚愷炎、楊杰、陳緒高、陳樹聯(lián)、羅林、葉三元。

圖書目錄

Foreword
1 General Provisions
2 Terms
3 Slope and Excavation
3.1 GeneraI Requirements
3.2 Slope Deformation Monitoring
3.3 Slope Support Monitoring
3.4 Adverse Blast Effect Monitoring
3.5 Detecting of the Range of Rock mass Relaxation
3.6 Slope Seepage Monitoring
4 Cofferdam
4.1 General Requirements
4.2 Cofferdam Surface Deformation Monitoring
4.3 Crack Monitoring
4.4 Morutoring on Water Level and Flow Rate of Cofferdams
4.5 Hydraulics Monitoring on Overflow Cofferdam
5 Underground Works
5.1 GeneraI Requirements
5.2 Surrounding Rock Stability Monitoring
5.3 Blast Effect Monitoring
5.4 HarmfuI Gas Monitoring
6 Concrete Dam and Powerhouse
7 Earth-rockfill Dam
8 Processing and Analysis of Monitoring Data
Annex A Monitoring Items and Frequency for Cofferdam Construction
Annex B Methods and Content of Advance Geological Forecast
Explanation of Wording in this Specification
List of Quoted Standards

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) www.autoforsalebyowners.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號 鄂公網(wǎng)安備 42010302001612號