注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)工業(yè)技術(shù)建筑科學(xué)工具書/標(biāo)準(zhǔn)鐵路給水排水施工技術(shù)規(guī)程(Q\CR9221-2015 英文版)

鐵路給水排水施工技術(shù)規(guī)程(Q\CR9221-2015 英文版)

鐵路給水排水施工技術(shù)規(guī)程(Q\CR9221-2015 英文版)

定 價(jià):¥700.00

作 者: 中國鐵路總公司
出版社: 中國鐵道出版社
叢編項(xiàng):
標(biāo) 簽: 暫缺

購買這本書可以去


ISBN: 9787113214159 出版時(shí)間: 2016-04-01 包裝:
開本: 16開 頁數(shù): 99 字?jǐn)?shù):  

內(nèi)容簡介

  This specification is formulated to unify technical requirements for the construction of railway water supply and sewerage works, strengthen construction technology management and ensure construction quality.This specification is applicable to the water supply and sewerage works of new railways or renovated railways.Construction of railway water supply and sewerage works shall comply with national laws, regulations and relevant technical standards, and strictly conform to design documents. In the construction of railway water supply and sewerage works, the management system, personnel allocation, field management and process control, etc., shall be standardized, so as to achieve such construction targets as quality, safety, construction schedule, investment benefit, environmental protection and technical innovation.Mechanization, member prefabrication in plant, professionalization and informatization shall be actively promoted in the construction of railway water supply and sewerage works.The HSE (Health, Safety, Environment) management level shall be raised in the construction 9f railway water supply and sewerage works.If cultural relics protection organizations are involved, the railway water supply and sewerage works shall be constructed on the basis of relevant regulations and protection measures specified in design.In the construction of railway water supply and sewerage works, risk management shall be properly conducted in consideration of the actual site conditions and by means of risk planning, risk identification, risk evaluation, risk assessment and risk control, and specific construction schemes and emergency plans shall be established.Construction of railway water supply and sewerage works shall comply with relevant national laws, regulations and technical standards on resource saving, energy saving and emission reduction, and the technical measures for energy saving and emission reduction shall be formulated and implemented, taking into account engineering characteristics and construction environment.In the construction of railway water supply and sewerage works, the construction personnel shall receive training and pass examination before assuming the post.During railway construction9 relevant data shall be collected and sorted out in time, which shall be complete, real and accurate, and the archiving and management of the data shall be well performed in accordance with relevant requirements,Main equipment and materials used for the construction of railway water supply and sewerage works shall comply with relevant current national standards, industrial standards, and the standards of China Railway CorporationThe railway construction clearance shall not be intruded by the installation of the trackside equipment of the railway water supply and sewerage works.

作者簡介

暫缺《鐵路給水排水施工技術(shù)規(guī)程(Q\CR9221-2015 英文版)》作者簡介

圖書目錄

1 General Provisions
2 ConstructionPreparations N
2.1 GeneralRequirements N
2.2 Construction Investigation
2.3 Practical Construction Program
2.4 ConstructionSurveying
2.5 CommencementofWorks
2.6 Labor Safety and Labor Health
3 Tube Well
3.1 GeneralRequirements
3.2 Preparation and Processing of Materials for Tube Well
3.3 TubeWelIDrilling
3.4 Installation of Well Tubes
3.5 Gravel Filling for Tube Well and Tube Outside Sealing
3.6 Flushing of Tube Well,Water Pumping Test and Water Quality Test
4 Large Diameter Well,Joint Well,Radial Well and Water Collecting Well
4.1 GeneralRequirements
4.2 WellShaftConstruction
4.3 Shaft Bottom Construction
4.4 Radial Pipe and Water Collecting Pipe
5 Structure for Surface Water Intaking
5.1 GeneralRequirements
5.2 Cofferdam
5.3 WaterIntakingHead
5.4 Aqueduct
5.5 Pump Well
5.6 Water Intaking by Floating Pontoon
6 Installation of SpecialDevices
6.1 GeneralRequirements
6.2 CentrifugalPump
6.3 SubmersiblePump
6.4 Installation of Sewage Discharging Unit and Vacuum Machine Set
6.5 Connection of Water Pump Pipeline
7 Pipelines
7.1 GeneralRequirements
7.2 TubularProduct
7.3 Pipe Trench and Pipe Base
7.4 Pipeline Installation and Laying
7.5 Pipe Trench Backfill
7.6 Pipeline Jacking Construction
7.7 Horizontal Directional Drilling
7.8 Laying of Vacuum Sewage Discharging Pipelines
7.9 Construction of Ancillary Facilities of Pipeline
7.10 Pipeline Test,F(xiàn)lushing and Disinfection
8 Structures for Water Storage and Distribution
8.1 General Requirements
8.2 Foundation Pit Excavation and Ground Treatment
8.3 Pool
8.4 Water Tower
8.5 Pump House
9 WaterTreatment
9.1 General Requirements
9.2 Equipment Installation
9.3 Anti-corrosion Works
Appendix A Air-tight Test for Vacuum Sewage Discharging Pipeline
Appendix B Functional Test for Vacuum Sewage Discharging System
Appendix C Inspection Record for Hydro-pressure Test of Pipeline
Appendix D Inspection Record for Pipe Water Closing Test
Appendix E Pipe Air Pressure Test
Appendix F Full Water Test of Pool
Appendix G Minimum Overlapping Length of Longitudinal Tensioned Bar
Explanation of Wording in this Specification

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) www.autoforsalebyowners.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號(hào) 鄂公網(wǎng)安備 42010302001612號(hào)